Client:Florida Department of Transportation, District 2 Services Provided:• Roadway Design Performance Dates:1998 - 2000 Construction Cost:$4.5 Million |
![]() SR 200 (US 301) Roadway and Bridge Replacement |
Project Description:
Eisman & Russo provided highway design, maintenance of traffic, roadway and school signals, major drainage improvements, pond designs, wetland mitigation and preparation of construction plans for 1.0-mile roadway section, including two- to five-lane urban improvement with construction of new high-level bridge over CSX railroad to eliminate at-grade crossing. E&R E&R received a Performance Grade of 94 from the FDOT. In addition, the project was completed without quantity revisions during the final project stages. The caption under the photo should say, “SR 200 (US 301) Roadway Construction.

